Trenches. Slopes.Foundations.
The jobs machine control was built for — dug on grade with a CHCNAV system. The result slots below are open: our first Green Grade job photos and numbers land here as crews finish, and yours could be first.
Trenching
Utility trenches, dug once
Depth-locked guidance holds the bucket inside a ±3 cm green zone for the whole run — no second pass, no bedding waste, nobody down the hole with a laser.
Dug on gradeSlopes
Slopes cut to the drawing
The design model rides in the cab. Cut the batter once, on grade, with live cross-slope readout — no string lines pegged down the face.
Foundations
Foundations on the first pass
Pad outlines and levels straight from the model. Dig to design, verify as-built on screen, and hand the engineer a clean hole.
Dug on gradeFirst hole's on us.
Book a demo, let the system prove itself on your ground, and your job could be the first real numbers on this page.