Field proof

Trenches. Slopes.Foundations.

The jobs machine control was built for — dug on grade with a CHCNAV system. The result slots below are open: our first Green Grade job photos and numbers land here as crews finish, and yours could be first.

01

Trenching

Utility trenches, dug once

Depth-locked guidance holds the bucket inside a ±3 cm green zone for the whole run — no second pass, no bedding waste, nobody down the hole with a laser.

SystemEasyNAV EMG100
Machine[your make / model]
Scope[0,000] m of trench
Result[your result — e.g. zero over-cut]
Pipe installation in an urban trench
Dug on grade
02

Slopes

Slopes cut to the drawing

The design model rides in the cab. Cut the batter once, on grade, with live cross-slope readout — no string lines pegged down the face.

SystemMCNAV TX73
Machine[your make / model]
Scope[0,000] m² at 1:[n] batter
Result[your result — e.g. one-pass batters]
Bulldozer working a slope on a construction site
Dug on grade
03

Foundations

Foundations on the first pass

Pad outlines and levels straight from the model. Dig to design, verify as-built on screen, and hand the engineer a clean hole.

SystemMCNAV TX73
Machine[your make / model]
Scope[n] pads to [depth] m
Result[your result — e.g. zero rework]
Excavator moving earth on a foundation site
Dug on grade
Your job here

First hole's on us.

Book a demo, let the system prove itself on your ground, and your job could be the first real numbers on this page.

Request a demo